RCS3D
Ballito WWTWiLembe District Municipality

Hugh Dent SPS

Asset Inspection Dashboard · Sub-facility of Ballito WWTW · KwaZulu-Natal · 27 March 2026

Hub
Project  J000600-B
Inspected  27 Mar 2026
Assets  35
RTK Points  82 (all FIX)
Total Assets
35
Captured & verified
Good Condition
3
8.6% of total
Fair Condition
21
60% — operational
Poor Condition
6
17.1% — attention
RTK Points
82
100% FIX quality
Matterport
3D
Scan completed
Asset Condition & Distribution
Condition Distribution
35 assets · Fulcrum field capture · 27 March 2026
CSV — 35 assets
Good (3)
Fair (21)
Poor (6)
Ungraded (5)
Asset Type Breakdown
19 unique asset categories
Valve Sizes
12 valves total across site
Pump Classification
8 submersible pumps identified
8
Submersible Pumps
Wet well configuration
Primary SPS Asset
Asset Register
35 assets · Hughdent SPS · 27 March 2026 · All coordinates geo-referenced (RTK FIX)
Very GoodLike-new, minimal wear. Within first 25% of lifecycle.
GoodEarly wear, all systems functioning. No major repairs.
FairModerate wear affecting performance. Meets minimum requirements.
PoorSignificant deterioration. High maintenance required.
CondemnedFailed, obsolete or poses severe safety/regulatory risk.
Showing 35 of 35 assets
#Asset DescriptionSub-FacilityType / SizeConditionUtilisationStatus
RTK GPS Inspection
Reach RS2+ · FIX RTK82 Points
DeviceEmlid Reach RS2+
Solution100% FIX
CorrectionRTK
Inspection date27 Mar 2026
Total points82
Coord systemWGS84
Buildings outlined8 structures
Fence/perimeter28 points
Road / kerb38 points
Manholes surveyed8 (cs1–cs8)
Avg lateral RMS±14mm
Site centre-29.4966, 31.2421
Surveyed Feature Breakdown
Matterport 3D Scan
Matterport Pro3 · March 2026
ScannerMatterport Pro3
Scan typeInterior + Exterior
FacilityHugh Dent SPS
Geo-referencedYes — RTK GCPs
StatusComplete
Full 3D digital twin geo-referenced with RTK GCPs. Matterpak available on request.
Site Observations & Alerts
Full RTK Coverage82 survey points, 100% FIX — precise geo-referencing of all site features
Matterport 3D Scan CompleteDigital twin captured and geo-referenced with RTK GCPs. Matterpak available on request.
6 Assets in Poor Condition17.1% rated Poor — maintenance schedule recommended
5 Assets UngradedRe-inspection required — In Progress status in Fulcrum
Aging Valve InfrastructureMultiple valve chambers — DN200 and DN300 valves require priority maintenance
Manhole Survey — cs1 to cs8
8 ManholesRTK FIX · Reach RS2+
IDNameLatitude (WGS84)Longitude (WGS84)Northing RMSEasting RMSSolution
cs1Manhole 1-29.4965494731.24211826±10mm±10mmFIX
cs2Manhole 2-29.4965457831.24213032±10mm±10mmFIX
cs3Manhole 3-29.4965390131.24216311±10mm±10mmFIX
cs4Manhole 4-29.4965278831.24218757±10mm±10mmFIX
cs5Manhole 5-29.4965133531.24217963±10mm±10mmFIX
cs6Manhole 6-29.4964386931.24215835±10mm±10mmFIX
cs7Manhole 7-29.4964677131.24220574±10mm±12mmFIX
cs8Manhole 8-29.4965159031.24222065±10mm±10mmFIX
IoT Readiness Assessment — Hugh Dent SPS
76%
IoT Ready
◐ Partial — In Progress
READINESS FACTORS
Geo-referencing & RTK Survey
100%
82 FIX-quality RTK points · All structures geo-referenced · 8 manholes surveyed
3D Digital Twin
100%
Matterport Pro3 complete · Geo-referenced with RTK GCPs
Asset Register Completeness
86%
30 of 35 assets verified · 5 records In Progress · Condition ratings captured
Sensor & Connectivity Readiness
55%
Pump station layout mapped · Wet well access confirmed · Connectivity survey pending
Asset Condition Baseline
60%
6 assets rated Poor · 5 ungraded · Pump condition requires further inspection
Next Steps to 100%
RTK GPS survey complete
3D Matterport scan complete
Complete 5 pending asset records
Re-inspect 6 poor-condition assets
Connectivity site assessment
Define pump telemetry points
Field Issue Reports — Hugh Dent SPS
0
Open
0
In Progress
0
Closed
0
Critical
No issues logged. Use "Log Issue" to report a field finding.
Log Field Issue — Hugh Dent SPS
IoT Readiness — What Does This Mean?
Understanding your site's digital infrastructure score · J000600
What is IoT Readiness?

The IoT Readiness Score measures how prepared your water infrastructure is to connect to a real-time digital monitoring system — often called the Internet of Things (IoT) or a Smart Water Network.

Think of it as a report card showing how much groundwork has been completed before live sensors, automated alerts, and remote monitoring can be switched on. A score of 100% means the site is fully equipped and connected. Most sites build toward this over time as data is captured and systems are integrated.

This score was developed by Siza as part of the J000600 Digital Twin Programme to give asset owners a clear, objective view of where each site stands on its journey to full digital integration.

Top 3 Reasons We Are Gathering This Data
01
Prevent Failures Before They Happen
Real-time sensor data detects abnormal readings — pressure drops, pump vibration, flow anomalies — and alerts operators before a breakdown occurs. This shifts maintenance from reactive to predictive, dramatically reducing downtime and emergency costs.
02
Optimise Energy & Operating Costs
Water treatment is energy-intensive. Connected systems identify which assets consume more energy than expected, when pumps run inefficiently, and where processes can be automated. Municipalities typically achieve 15–30% energy savings after full IoT integration.
03
Regulatory Compliance & Audit Trail
DWS and water boards require accurate, timestamped records of treatment performance and maintenance activity. A connected asset register provides an automatic, tamper-proof audit trail — reducing compliance risk and simplifying annual reporting to regulators.
How the Score is Calculated

Six components are scored independently and averaged to produce the final percentage.

ComponentWhat it measuresThis site
Geo-referencing% of assets with RTK GPS coordinates captured
100%
Asset Registration% of assets fully recorded in the digital register
100%
Condition Data% of assets with an assigned condition grade
100%
3D Digital TwinMatterport / reality capture scan completeness
100%
SCADA / ConnectivityExisting site SCADA infrastructure and network access
40%
Data IntegrationSCADA/sensor data actively feeding the digital twin
20%